Commercial floor prep: removing old flooring and laying underlayment in a large room

A large commercial room is a different scale of project from a house. There is more floor, more to move and less room for mistakes, because the surface has to be flat across the whole area. This is how the floor was stripped and prepared in a big open room with a drop ceiling.
Stripping back to the subfloor
Old flooring came up in stages, leaving a bare plywood subfloor with adhesive and stains. Rolls of blue underlayment are staged around the room, ready to go down.

Cleaning and scraping
Before the underlayment goes down, the plywood is scraped and vacuumed so no ridges or grit are left to telegraph through the finished floor.

Adjoining spaces and washrooms
The same preparation carries into the neighbouring washroom, where the floor is scraped back and rolled with a coating before new flooring.

Laying the underlayment
In the main room, blue underlayment is taped and laid in sections, with a grey base area in the middle where the next layer is being prepared.

Careful staging and daily cleanup let the business keep running around the work where possible.
Need commercial flooring prepared properly? Request a free estimate and we will look at the job and quote it clearly before we start.
Need a hand with a project?
Book the VOL Handyman team for the work in this article, or anything else around your home or business.



