Rebuilding a shower: ceiling framing, membrane and cement board before the tile

A shower is only as good as what is behind the tile. Once everything old has come out, the work is rebuilding the structure so it is flat, tight and ready to be waterproofed. The photo above shows the finished stage, with dark boards on every wall and the ceiling, with patched seams ready for the next layer.
Ceiling framing and membrane
The ceiling is framed to hold the light and fan, with a black membrane laid over the top. Temporary work lights hang from the framing while the work continues.

Walls that are flat and sealed
Walls are framed and insulated, with a vapour layer fastened over the insulation. Everything has to be straight, because tile follows whatever is underneath it.

Valve bodies in place
When the boards go up, the valve bodies are already set at the right depth, with protective rings around them. Seams are taped and filled, and a recess is framed for a niche.

What makes this stage important
- Boards are fastened flat and square.
- Valve depth is set for the finished tile thickness.
- Niche and shelf openings are framed accurately.
- Seams are sealed so the waterproofing layer is continuous.
For a step-by-step look at the next stages, see our guide to how a waterproof shower is built.
Planning a shower rebuild? Request a free estimate and we will look at the job and quote it clearly before we start.
Need a hand with a project?
Book the VOL Handyman team for the work in this article, or anything else around your home or business.